RESSEEPE Project – Sustainable Building Innovations at Coventry University – PCM

Coventry University and the RESSEEPE partners have been very busy over the past few months progressing the RESSEEPE research into the demo site activities phase.  It’s at this point where the practical end of the demonstrations is coming into action and the really exciting work is happening. Having been a part of the project since its initial practical kick off its great to see the technologies explored as a part of the project actually gong onto the buildings. Over the next few weeks a number of articles will be released discussing each of the technologies installed at Coventry University.

IMG_2928

PCM – Sample of the tube form unfixed and loose

The first major works at Coventry consisted of the installation of Phase Change Materials (PCM).  PCM is a passive system, which behaves similar to ice, in that the material ‘freezes’ and melts at a fixed temperature.  The PCM installed in Coventry is a S27 phase change material, which is a salt hydrate that peaks at 27oC.  In reality, the PCM may start the melting process at 25oC and be completely liquid at 29oC.  In reverse, the PCM may show signs of solidification at 29oC and be completely solid at 25oC. 

 

 

The PCM Tubes are installed and respond to the surrounding temperature of the room.  At the beginning of the day, the TubeICE are frozen.  As the room heats up due to body heat, and heat from the sun, the PCM Tubes passively cool the room by absorbing the heat until completely melted. 

PCM Passive System Throughout Day

PCM Passive System Throughout Day

The duration of the cooling effect is dependent on the intensity of the heat being absorbed.  I.e. the PCM will melt quicker if the ambient temperature in the room is 40oC compared to if the temperature is 35oC, much like a block of ice would.  As the temperature cools over night, so does the PCM.  The PCM effectively looses energy to the immediate surroundings, charging for the next day. 

 

PCM - Overnight

PCM Overnight

IMG_2927

PCM bracket System

One of the challenges with installation was due to the unknown entity of the PCM. A number of local contractors were approached to install but were put off by the increased risk factor when dealing with a technology which is very new. Contractors rightly so have to consider the increased level of risk and liability that they will take on when dealing with something they have little precedent or experience in handling. In reality once a contractor had been identified the installation was fairly straight forward. Certain protocols had to be adhered to such as a structural assessment of the space and an asbestos survey, both to ensure that firstly the structure could hold the increased loading of the PCM tubes and secondly to ensure that no surprises were found in regards to asbestos. Both were cleared and the installation was quick and uneventful. As can be seen from the image the PCM tubes were fixed using a standard tube fixing bracket system which was fixed to the underside of the ceiling.

PCM technology was installed within the Architecture Studio and 2 offices within the John Laing Building at Coventry University. The spaces and tubes will be energy monitored over the next year to gather full performance data, which will be objectively compared to controls rooms neighbouring the spaces. Below the PCM tube can be seen in-situ.

IMG_2558

PCM tube in-situ

 

PCM tube in-situ

PCM tube in-situ

Contributors – Danny McGough and PCMproducts

(65)

Forming Teams – Steve Austin

CU_logo-660x405

This video is designed to provide a starting point awareness of forming teams and collaboration. At Coventry University we have been running a number of modules using a flipped approach. The Flipped approach that we have adopted is to have students … [Continue reading]

Facing Risk – Steve Austin

CU_logo-660x405

This video is designed to give a starting point awareness on facing risk within a teamwork environment. At Coventry University we have been running a number of modules using a flipped approach. The Flipped approach that we have adopted is to have … [Continue reading]

RESSEEPE – Coventry University Activities

RESSEEPE-logo

January has been a busy month for Coventry University (CU). For the latest RESSEEPE meeting CU made the trip to Skellefteå, which is one of the four demo sites within the project. The discussion of the meeting was focused around the next immediate … [Continue reading]

BIM in a Whole Life Concept

(Exercise support content contained in this article. These articles are developed to support flipped learning approach so some comments are present to direct higher education discussion) A better understand of BIM considers BIM beyond the concept … [Continue reading]

By continuing to use the site, you agree to the use of cookies. more information

The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.

Close